Green Acres Mall Pavement LOCATION Valley Stream, NY
Project included analysis, design and inspection for replacement of existing parking area and travel lane pavement located at the Green Acres mall. After careful review of the existing pavement conditions and a review of the project budget it was determined the project would include milling and re‐paving the existing 60,000 SY parking field.
Project plans and specifications were prepared and issued for bid, followed by the analysis of the bids and recommendation of low bidder to owner.
During construction the milling and paving operations were inspected for conformance with the specifications and standard construction practices. Measurements were made and progress payments were made during the project based on work completed. Upon completion of the work a punchlist was created and final inspection made.
Project included analysis, design and inspection for replacement of existing parking area and travel lane pavement located at the Green Acres mall. After careful review of the existing pavement conditions and a review of the project budget it was determined the project would include milling and re‐paving the existing 60,000 SY parking field.
Project plans and specifications were prepared and issued for bid, followed by the analysis of the bids and recommendation of low bidder to owner.
During construction the milling and paving operations were inspected for conformance with the specifications and standard construction practices. Measurements were made and progress payments were made during the project based on work completed. Upon completion of the work a punchlist was created and final inspection made.